Construction on a new secondary science lab began in the summer of 2016 thanks to a very generous donation from a faithful PCA partner. This space will serve as the biology lab to further prepare PCA students for the challenges ahead during their college years.
Read More2016
In the spring of 2016, the PCA security system installation began with the addition of security doors in the church building leading to the Frank Smith Lunch Room and the lower level classrooms. In the secondary building, security doors were added, providing lock down capabilities for all classrooms. Staff were provided key cards for entry.
Read More2015-2016
PCA underwent the reaccreditation process with ACSI during the 2015-2016 school year. The accreditation process is rigorous and required a huge team of administration, faculty, staff, students and parents. PCA received a very strong report and a five-year accreditation certificate, the longest time frame available.
Read More2014-2015
The 2014-15 school year was marked by a tremendous gift and investment in technology at PCA as we launched the “Bring Your Own Device” program. Every incoming 9th grader during this year received a device from the school. The 10th-12th grade students were required to bring their own device and our teaching staff began to Read More
Read More2014
During the spring of 2014, PCA received certification from the U.S. State Department to serve as a school for foreign exchange students. This certification allows us to reach out to students around the world who would like to attend Plymouth Christian during their high school years. We are excited about the worldwide reach and ministry Read More
Read More2012
In March of 2012, we earned Association of Christian Schools International (ACSI) accreditation. As stated on the ACSI website, this accreditation is used to validate PCA’s quality and verify that PCA is striving for excellence based on a solid Christian philosophy of education foundation.
Read More2009-2011
In the fall of 2009, swings and basketball hoops were installed near the baseball field. The fall of 2010 brought the opening of our new nature trail with a ribbon cutting ceremony, followed by our first 5K run on Saturday, October 2, 2010. The summer of 2011 was marked by more construction as a new Read More
Read More2000-2002
In the spring of 2000, God opened the door for the purchase of the 19 acres adjacent to the school. A baseball field, a softball field, and soccer field have been constructed on the property. In 2002, the property to the south of the campus became available and once again God blessed our school and Read More
Read More1999-2000
The 1999-2000 school year started with the construction of new additions – a weight and locker room were added to the athletic facility along with the multipurpose room (now known as the Activity Center). The large multipurpose room would serve as a much needed second gym and secondary lunchroom and would be flanked by four Read More