1999-2000
The 1999-2000 school year started with the construction of new additions – a weight and locker room were added to the athletic facility along with the multipurpose room (now known as the Activity Center). The large multipurpose room would serve as a much needed second gym and secondary lunchroom and would be flanked by four first floor classrooms.